Which tools are required to install the SMS device on the motor?
The tools required to install the device are enclosed in the SMS shipping box:
- Sandpaper
- Epoxy
- Fixing clamps and screws
What are the characteristics of the bi-component Epoxy adhesive used for the SMS installation?
You need to use a metal to metal bonding, with a minimum hardness of D84.
During the installation, is it necessary to stop the motor?
No, the SMS can be installed with safety on the frame of the motor even when the motor is operating.
Can we install the SMS on a vertical motor?
Yes, the SMS can be installed on a vertical motor: simply rotate the sketch displayed in the “Fixing the device to the motor” section of the Installation so that it corresponds to the way your motor is positioned.
Can the SMS be installed on this motor with IP23 since this motor doesn’t have heat dissipation fins?
If the motor doesn’t have heat dissipation fins, ask your ADI representative to send you a special installation kit: it’s a magnetic base to fix the sensor on the motor frame, as shown on this picture: